久久综合久久自在自线精品自,午夜肉伦伦影院无码,999视频精品全部免费品,伊人伊成久久人综合网小说

      Language:CHINESESENGLISH

      Home > News > Fire protection measures for steel frame warehouse
      CONTACT US
      • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
      • Phone:0757-81002668/0757-63323396
      • Fax:0757-81196682
      • Contact:Ben Zheng/13826981293 Kerry Lu/13751224830
      • E-mail:sbs@sbsprefabhouse.com
      • URL:http://www.iigii.cn

      Fire protection measures for steel frame warehouse

      Time:[2021-12-23]  Hits:1918

      With the rapid development of China's steel structure construction, steel structure engineering has become the mainstream of China's industrial construction industry because of its simple design structure, light weight, high strength, fast construction speed and cheap price and etc, so that a large number of steel structure in industrial warehouses, high-rise buildings have been excellent applications. But the fire resistance of steel frame warehouse is poor, the fire protection of steel structure is particularly significant, so how to do the fire protection setting of steel frame warehouse?

      Regarding the structure fire prevention of steel structure, steel structure usually in 450 to 650 degrees temperature will lose the carrying capacity, a large deformation, resulting in steel columns, steel beam bending, the result because of excessive deformation can not continue to use, generally unprotected steel structure fire resistance limit of about 15 minutes. The length of time is also related to the speed at which the component absorbs heat. In order to overcome the deficiency of fire prevention in practical application, fire protection treatment must be carried out, and in order to improve its fire resistance limit, several fire protection measures of steel structures are introduced below,

      1. Expansion materials
      The use of steel structure fire protection coating to protect components, this method has good fire insulation performance, construction is not limited by steel structure geometry and other advantages, generally do not need to add auxiliary facilities, and the coating quality is light, there is a certain aesthetic decorative effect, belongs to the modern advanced fire prevention technology measures.


      2. Outsourcing layer.
      Construction personnel can try to add cladding to the surface of the steel structure, either by casting in place or by spraying. Cast-in-place solid concrete cladding is usually reinforced with wire mesh or steel bars to limit cracks caused by shrinkage and ensure the strength of the shell. The spraying process creates a protective layer on the surface of the steel structure at the construction site by applying sand pumps, which can be lime cement or gypsum mortar, or permeated with pearl wool or asbestos.

      3. The water filling
      Filling water in hollow steel structure is the most effective protection against fire. This method can keep the steel structure at a lower temperature in fire and absorb external heat, so as to reduce the loss of steel structure.


      4.Shielding
      Fireproof coating is one of the common steel structure fire prevention measures, construction personnel can be wrapped by refractory materials in the gap between two walls, this kind of fire prevention only needs to add refractory materials can achieve the ideal fire prevention purpose.

      Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
      久久综合久久自在自线精品自

          片多多电影电视剧影视剧| 小小影院 电视剧免费| 国产精品一区久久久久| 国产欧美日韩一区| 国产偷窥熟女高潮精品视频| 亚洲日韩欧美一区二区三区| 漂亮人妻被中出中文字幕| 久久精品99国产精品亚洲| 久久精品国产精品2020| 人人人妻人人澡人人爽欧美一区|