久久综合久久自在自线精品自,午夜肉伦伦影院无码,999视频精品全部免费品,伊人伊成久久人综合网小说

      Language:CHINESESENGLISH

      Home > News > Installation point supported glass curtain wall supporting structural members shall comply with the requirements of
      CONTACT US
      • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
      • Phone:0757-81002668/0757-63323396
      • Fax:0757-81196682
      • Contact:Ben Zheng/13826981293 Kerry Lu/13751224830
      • E-mail:sbs@sbsprefabhouse.com
      • URL:http://www.iigii.cn

      Installation point supported glass curtain wall supporting structural members shall comply with the requirements of

      Time:[2014-6-18]  Hits:4117

      Device point supported glass curtain wall supporting structural members shall comply with the following requirements:
      1, Foshan steel device during system holes, assembly, welding and painting processes should comply with "steel construction and acceptance criteria" of the relevant provisions of GB50205;
      2, a large steel structure should be hanging point plan and examination hanging;
      3, steel unit in place, tighten the adjustment should be timely and reporting concealed work;
      4, the steel components in the transport, storage and equipment damaged during coating and uncoated device convergence site,
      5, must be applied to pre-tension the steel rod and steel cable devices. Optional pre-tension dynamometer measurement should be consistent with the planning requirements. Should set the pre-tension adjustment.
      Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
      久久综合久久自在自线精品自

          色狠狠久久AV五月综合| 国产裸体美女永久免费无遮挡| 国内精品视频一区二区三区| 国产免看一级a一片成人av| 国产成人精品无缓存在线播放| www.五月天| 天天爽夜夜爽夜夜爽精品视频| 东京热人妻无码一区二区av| 亚洲国产精品无码久久久秋霞1| 九九国产精品国产一区二区|