久久综合久久自在自线精品自,午夜肉伦伦影院无码,999视频精品全部免费品,伊人伊成久久人综合网小说

      Language:CHINESESENGLISH

      Home > News > Mixed steel installation drawings and design changes
      CONTACT US
      • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
      • Phone:0757-81002668/0757-63323396
      • Fax:0757-81196682
      • Contact:Ben Zheng/13826981293 Kerry Lu/13751224830
      • E-mail:sbs@sbsprefabhouse.com
      • URL:http://www.iigii.cn

      Mixed steel installation drawings and design changes

      Time:[2014-9-27]  Hits:4612

              Drawings should be carried out before the installation of steel joint hearing before the joint hearing of construction units should be familiar with and master design file contents, find the component mounting problems affecting the design and review with other professional engineering with inappropriate ways.
        
      1 drawing Mixed

      Before installation of steel structures, construction units in order to solve problems in a familiar drawing found during the technical problems and quality problems found in the drawings nipped in the bud, the parties participating in the construction drawings to conduct joint hearing.
      Mixed content drawings generally include:
      Qualification (a) meets the design units, drawings, whether by design unit officially signed.
      (2) design units to do the design intent description and proposed process requirements, the main production unit introduces steel production process.
      Have a contradiction between (3) professional drawings.
      (4) between each drawing plane position, elevation, etc. are the same, mark whether the omission.
      (5) the professional construction and construction procedures with or without problems.
      Construction methods (6) Install the unit can meet the design requirements.

      2 design changes

      In the construction drawings before use, after use of design changes will occur due to the construction unit requirements, or changes in construction site conditions, or changes in national policies and regulations and other reasons caused. Design change for whatever reason, who proposed the construction unit must obtain the written consent and apply the change. There will schedule and cost impact of design changes, in strict accordance with the regulations should be implemented in order to clarify responsibilities and avoid claims event is not conducive to the construction.

      Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
      久久综合久久自在自线精品自

          久热这里只精品99re8久| 国产成人精品高清在线观看99| 国产一区二区精品久久| 少妇粉嫩小泬喷水视频WWW| 久久久无码精品亚洲日韩aV| 9l久久久久久久亚洲精品桃| 无码精油按摩潮喷在播放| 国内少妇偷人精品视频免费| 国产一区二区57| 国产精品婷婷久久久久久|