久久综合久久自在自线精品自,午夜肉伦伦影院无码,999视频精品全部免费品,伊人伊成久久人综合网小说

      Language:CHINESESENGLISH

      Home > News > 258 meters all-steel housing will be built in the member when the Lake
      CONTACT US
      • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
      • Phone:0757-81002668/0757-63323396
      • Fax:0757-81196682
      • Contact:Ben Zheng/13826981293 Kerry Lu/13751224830
      • E-mail:sbs@sbsprefabhouse.com
      • URL:http://www.iigii.cn

      258 meters all-steel housing will be built in the member when the Lake

      Time:[2014-11-19]  Hits:5178

      ■ building energy museum and the public to experience the versatility Trinity roller shutters. Foshan Steel

      The country's highest all-steel residential building where? Lake in Xiamen. Yesterday, at the international building energy efficiency and green building to carry out the Forum, the deputy director of the Municipal Construction Bureau, chief engineer Lin branches disclose this audio.

      At the forum, Lin branch focuses on the latest developments in Xiamen architectural industrialization and the housing industry.

      Text / reporter intern Cai Shanshan Wangshao Liang map / Chen Lixin

      [Steel] Pilot

      Can greatly reduce the amount of cement gravel hundred percent recycled or degraded

      Lin branch, said low-carbon steel housing, environmental protection, construction can greatly reduce the sand, stone, cement consumption, the main source of data used green materials, 100% recyclable or degradable, in the building demolition, most of the information can be with or degradation does not become waste.

      He said steel housing fit the housing industry and the requirements of sustainable undertaken. Steel suitable for mass production factory, a high degree of industrialization, and is capable of saving, waterproofing, insulation, windows and doors, and other advanced finished in one set, sets, raise the level of the construction industry.

      Currently, steel housing is Xiamen pilot, promotion, highlights remarkable. As under construction in Xiamen Regal Court, it is the choice of all-steel construction, without external scaffolding and wooden templates, most of the building material for recyclable materials, short construction period, less construction waste. Regal Court is the country's tallest all-steel residential building, 62-storey building height of 258 meters.

      [Building] industrialization

      By 2020 more than half of the new construction of industrial clusters formed on-site installation

      September of this year, Xiamen approved the "National Housing Industry Modernization integrated pilot cities."

      Lin branches that Xiamen has been the introduction of "new construction in Xiamen industrialization plan", the city's affordable housing first pilot; in 2015, at least in each district to organize a new building industrial building; in 2016, the building area of newly started projects without housing industry less than 30% of the total area of the city, and every year a sliding scale; by 2020, the formation of an integrated, systematic planning of the construction industry clusters, the city's building-mounted more than 50% year to start construction area.

      The so-called installation architecture, not built at the site a little bit, but the structure of pre-made at the factory is good, then transported to the site installation.

      In order to promote the construction of industrialization, has been located in Xiamen Haicang build demonstration park, the choice of "a garden multi-base" model of economic development headquarters, research and design industrial park full, integrated handle, agglomeration effects and demonstration leading role, for the construction industry lay the foundation for the promotion of the modernization plan.

      Lin branch, at present, the park headquarters Lot has entered the construction phase of implementation. In the meantime, Haicang biomedical park b1 Lot # 4 plant, selection of precast columns, composite beams, reinforced laminated floor trusses, prefabricated wall panels and prefabricated plug stairs, parapets, the upper prefabricated rate of over 80%. This means that at least the upper part of the plant is mostly made at the installation site.

      Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
      久久综合久久自在自线精品自

          亚洲成A人V欧美综合天堂麻豆| 国产精品成人无码a v毛片| 亚洲天堂在线免费| 亚洲夜夜欢A∨一区二区三区| 青丝影院免费观看电视剧高清| 茄子视频最新版官网在线| 久久月本道色综合久久| 欧美成人精品视频播放| 久久精品免费| 91视频国产91久久久|