久久综合久久自在自线精品自,午夜肉伦伦影院无码,999视频精品全部免费品,伊人伊成久久人综合网小说

      Language:CHINESESENGLISH

      Home > News > Guangzhou Steel tells you: What is the steel construction program? What are the main contents?
      CONTACT US
      • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
      • Phone:0757-81002668/0757-63323396
      • Fax:0757-81196682
      • Contact:Ben Zheng/13826981293 Kerry Lu/13751224830
      • E-mail:sbs@sbsprefabhouse.com
      • URL:http://www.iigii.cn

      Guangzhou Steel tells you: What is the steel construction program? What are the main contents?

      Time:[2015-9-2]  Hits:4352

      Guangzhou Steel tells you: What is the steel construction program? What are the main contents?

       

      Construction of steel structures, such as factories, airports, etc., we are very familiar with, but many users do not concern steel construction program, but the quality of the steel construction program of construction and other factors is very large, which what steel construction program? The main content of steel construction programs have?
      Guangzhou Steel construction program was the construction of the construction project of a steel designated under implementation. Including arrangements for a scheme of arrangement (constituting each functional arrangements, the respective responsibilities, mutual relations, etc.), personnel program (project leader, the person in charge of each arrangement, the professional responsible persons), technical solutions (Progress arrangements, key technology plan, serious construction plans, etc.), security solutions (security overall request, the construction risk factors analysis, safety measures, serious construction safety plan, etc.), the information supplied to the program (data supply process, contact Paul seized the process, temporary (emergency issue) Data Acquisition processes, etc.). In addition, according to the project site to defend the program as well as the size, logistics solutions, and so on.
      Guangzhou Steel construction program
      Guangzhou Steel construction program is determined according to the project, some projects simple, short construction period will not demand to develop complex schemes.
      Guangzhou Steel construction program content
      Generally include the following:
      1, prepared in accordance with the principle of
      2, the preparation of the scope
      3, Project Overview
      4, the overall arrangement to settle and duration
      5, the construction technology program
      6, schedule assurance approach
      7, quality objectives, assurance system and guarantee measures
      8, objectives and ensure production safety measures
      9, emergency rescue plan
      10, season, winter construction assurance measures
      11 Environmental Protection Measures
      12, civil construction request
      13, the Party and coordination, supervision and design between

      Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
      久久综合久久自在自线精品自

          欧美伊人色综合久久精品| 亚洲AV无码一区二区二三区| 久久久国产视频| 青春草无码精品视频在线观看| 白嫩无码人妻丰满熟妇啪啪区百度| 99久久综合狠狠综合久久| 国农村精品国产自线拍| 精品久久久久久无码免费| 久久精品无码一区二区日韩AV| 亚洲一级二级欧美一区二区|