久久综合久久自在自线精品自,午夜肉伦伦影院无码,999视频精品全部免费品,伊人伊成久久人综合网小说

      Language:CHINESESENGLISH

      Home > News > Quality Management of Steel Structure Construction
      CONTACT US
      • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
      • Phone:0757-81002668/0757-63323396
      • Fax:0757-81196682
      • Contact:Ben Zheng/13826981293 Kerry Lu/13751224830
      • E-mail:sbs@sbsprefabhouse.com
      • URL:http://www.iigii.cn

      Quality Management of Steel Structure Construction

      Time:[2016-1-9]  Hits:3906

      Guangzhou Steel tells you: Quality Management of Steel Structure Construction

      Raw materials and finished approach: note the quality of imports of steel products shall comply with the new design and contract standards. Admission test to check the main qualification documents of product quality, the Chinese flag and inspection reports (including sampling reinspection report) and the like.
      Steel Welding Engineering
      Fasteners connection project: Note that when ordinary bolt as a permanent attachment bolts, when the design requirements or their quality is doubtful, you should check the bolts and physical reinspection report:
      Steel parts and steel parts processing;
      Installation of steel structures;
      Steel coating.
      Guangzhou Steel remind you; Additional Notes: steel construction process for temporary reinforcement, steel members supporting its raw materials, manufacture, welding, installation, corrosion, etc. should comply with the relevant technical standards and specifications.

      Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
      久久综合久久自在自线精品自

          GOGOGO高清在线观看免费韩国| GOGOGO高清在线观看免费韩国| 中文字幕亚洲综合久久| 三年片免费大全国语| 久久久久Av免费无码久久| 精品国产不卡一区二区三区| 丁香花在线电影小说| 亚洲国产欧美日韩精品一区二区三区| 99久久精品日本一区二区免费| 国产精品视频一区二区三区不卡|