久久综合久久自在自线精品自,午夜肉伦伦影院无码,999视频精品全部免费品,伊人伊成久久人综合网小说

      Language:CHINESESENGLISH

      Home > News > Guangzhou Steel welding inspection
      CONTACT US
      • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
      • Phone:0757-81002668/0757-63323396
      • Fax:0757-81196682
      • Contact:Ben Zheng/13826981293 Kerry Lu/13751224830
      • E-mail:sbs@sbsprefabhouse.com
      • URL:http://www.iigii.cn

      Guangzhou Steel welding inspection

      Time:[2016-3-19]  Hits:3683

      Guangzhou Steel welding inspection

      1. General Guangzhou Steel Structure

      (1) Welding Inspection Category

      1) self-test, the construction unit in the manufacturing, installation, Guangzhou steel unit with corresponding qualifications of inspectors or inspection agencies entrusted with the corresponding qualification tests carried out;

      2) supervisory inspection, the owner or his representative commissioned an independent third party inspection and testing organization with the corresponding qualification test performed;

      General Procedure 3) welding inspection, including inspection before welding, after welding inspection and welding inspection, and shall comply with the relevant regulations.

      2. visual inspection of weld

      Visual inspection can be carried out (1) All welds shall be cooled to ambient temperature.

      (2) visual inspection by visual way.

      3. The structure of the welding quality to withstand static load test

      The appearance quality of the weld should regulatory requirements. Weld size shall comply with the regulatory requirements.

      Basic requirements (1) non-destructive testing

      Non-destructive testing shall be carried out after the appearance of qualified testing.

      (2) design requirements of the full penetration welds, test internal defects

      1) a weld should be 100% inspection.

      2) two welds should be carried out sample testing, checking ratio of not less than 20%.

      3) three weld testing should be carried out according to the relevant design requirements, in general, may be non-destructive testing.

      (3) ultrasonic testing regulations

      When the ultrasonic detection result of doubt, can be used to verify ray detector.

      (4) Surface inspection provisions

      Ferromagnetic materials should be used to detect magnetic surface imperfections. When not using the magnetic particle testing, penetrant testing should be used.

      Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
      久久综合久久自在自线精品自

          国产欧美一区二区精品久久久| 亚洲国产人成精品无码区在线网站| 伦理电影在线| 国产成人精品无码专区| 无码A√毛片一区二区三区性色| 国产精品欧美日本韩免费一区二区三区不卡| 噼里啪啦电影在线观看免费高清| 美女露出奶头扒开尿口| 草莓香蕉樱桃黄瓜视频| 国产第一页国产精品免费|