久久综合久久自在自线精品自,午夜肉伦伦影院无码,999视频精品全部免费品,伊人伊成久久人综合网小说

      Language:CHINESESENGLISH

      Home > News > Guangzhou Steel plant with traditional plant What is the difference?
      CONTACT US
      • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
      • Phone:0757-81002668/0757-63323396
      • Fax:0757-81196682
      • Contact:Ben Zheng/13826981293 Kerry Lu/13751224830
      • E-mail:sbs@sbsprefabhouse.com
      • URL:http://www.iigii.cn

      Guangzhou Steel plant with traditional plant What is the difference?

      Time:[2016-4-16]  Hits:4344

      Guangzhou Steel plant with traditional plant What is the difference?


       
      Our steel plant in Guangzhou is a new house, is a steel structure as the main body, with integrated manner produced, compared to the traditional plant are mainly the following differences:

      Guangzhou Steel plant
      First, high structural stability, seismic, steel plant load-bearing body made of galvanized steel sheet composition and structure of the keel plate - ribbed wall structure that building good integrity, structure, light weight, can resist earthquakes and typhoons.
      Second, due to structural steel plant in Guangzhou full use of CAD design by computer control production, scantlings millimeter accuracy, for the latter part of renovation project to provide a good foundation. Production of industrial architecture for building large-scale, industrial development provides ample space.
      Third, build fast, build steel plant in the full realization of the plant and on-site assembly of prefabricated construction, it can achieve high strength after member in place, no intermittent construction technology, improved labor productivity, the members are fully in accordance with the design drawings accurate processing, construction site completely dry operation, a high degree of civilization construction.
      Fourth, flexible interior partition, usage rate, a large steel plant span gives us greater freedom of space division, since the thickness of the wall is only one half of the brick structure, so a significant reduction in construction area , use of an area up to 95% compared to traditional construction increased by about 6% -19% of the usable area.
      V. Wall Guangzhou Steel plant is composite wall, has a good insulation, heat insulation, sound insulation performance, compared with the plant of reinforced concrete structures more energy efficient and environmentally friendly.

       

      Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
      久久综合久久自在自线精品自

          被窝福利电影官网| 少妇被又大又粗又爽毛片久久黑人| 国产亚洲精久久久久久无码77777| 亚洲色无码一级毛片一区一区| 久久久久免费精品国产| 国产三级日本三级韩国三级在线观看| 国产精品毛片久久久久久久| 亚洲日本va午夜中文字幕| 久久久久久精品毛片免费不卡| 国内精品视频在线播放|