久久综合久久自在自线精品自,午夜肉伦伦影院无码,999视频精品全部免费品,伊人伊成久久人综合网小说

      Language:CHINESESENGLISH

      Home > News > How should the steel structure attic be installed?
      CONTACT US
      • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
      • Phone:0757-81002668/0757-63323396
      • Fax:0757-81196682
      • Contact:Ben Zheng/13826981293 Kerry Lu/13751224830
      • E-mail:sbs@sbsprefabhouse.com
      • URL:http://www.iigii.cn

      How should the steel structure attic be installed?

      Time:[2018-6-13]  Hits:4989

      With the continuous development of steel structure, steel structure has gradually developed in factories, commercial building, schools, villas and other buildings, because the advantages of easy installation, short time, cheap and so on are gradually replaced by traditional construction and installation methods. Foshan steel structure loft is also developing rapidly in recent years. It occupies a small area and can be applied to a large space. So how should the steel structure attic be installed?
      1., combined with the original design, we should design the link position and way of steel structure, and not destroy the original structure.
      2. in the process of installation and decoration, minimize damage to steel structures.
      3. in the installation process of the attic, must be force uniform, in the design of the road should be clear in the transmission line, the use of professional knowledge to analyze and calculate, to ensure the final visual performance.
      When installing the steel loft in Foshan, it is necessary to ensure the comfort of the whole structure and truly achieve the effect of good quality and low cost.
      Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
      久久综合久久自在自线精品自

          久久精品国产亚洲AV忘忧草短视| 国产v欧美Ⅴ日韩v在线观看| 欧美日韩在线精品| 亚洲东京色一区二区三区| 国产九色在线播放| 久久无码人妻精品一区二区三区| GOGOGO免费观看视频高清| gogogo日本免费观看电视动漫| 精品女同一区二区三区免费站| 99久久婷婷国产综合精品电影|