久久综合久久自在自线精品自,午夜肉伦伦影院无码,999视频精品全部免费品,伊人伊成久久人综合网小说

      Language:CHINESESENGLISH

      Homepage > Product > steel villa
      Contact Us
      • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
      • Phone:0757-81002668/0757-63323396
      • Fax:0757-81196682
      • Contact:梁先生/Mr Leung
      • Phone:18900873383/18900873268
      • E-mail:sbs@sbsprefabhouse.com
      • Skype: sbs-Candy
      • URL:http://www.iigii.cn

      steel villa

      steel villa

       

       

       steel villa

      1.STEEL STRUCTURE VILLA
      Steel structure villa industrial production using a combination of standard components, it has many advantages: flexible design, cost control, construction period is short, fast and convenient way to pay, environmental protection, good shock resistance, safer, more flexible, more savings energy. Steel structure villa widely built in tourist attractions, the seaside resort around the house or other purposes. If you want to understand the benefits of more steel structure villa, please contact us, we will answer your questions in detail.

       

       

       

      2.Steel Structure Panel material
      The steel structure panel material included EPS sandwich panel,Rock wool sandwich panel,PU sandwich panel,fiber-glass ,steel sheet.

      Steel structure panel material: including wall panel and roof panel
      Sandwich core materials: EPS, PU, rock wool, glass wool
      Thickness of sandwich panels: 50mm, 75mm, 100mm, 150mm
      Single color plate material thickness: 0.376mm, 0.426mm, 0.476mm

       

       

      3.Product details

      Product Name

      Prefabricated Steel Structure Villa

      Specification

      Foundation

      Concrete and Steel

      Support

      X or V types, angle steel or round tube

      Surface

      Two layers and anti-rust paint

      Color

      White, Grey, Blue, Green, etc

      size

      Designed by your requirement

      Advantages

      1. Stable Construction
      2. Anti-seismic performance
      3. Aesthetic appearance
      4. Short construction period
      5. High-speed installation
      6. Life span durability
      7. Environmental-Friendly product
      8. Energy saving

      Main component

      Base materials

      Cement and steel foundation bolts

      Main frame

      H beam (welded or hot rolled)

      Material

      Q35B,Q345B

      Purlin

      C purlin (C120-320) or Z Purlin (Z100-200)

      Bracing

      Tie bar, lateral bracing, column bracing, knee bracing, etc

      Bolt

      Normal bolt, high strength bolts, Galvanized bolt

      Roof & wall

      Sandwich panel, steel corrugated sheet

      Door

      Sliding door , rolling shutter

      Window

      PVC window, aluminum-alloy Window

      Accessories

      Skylight, ventilation, downpipe and galvanized gutter etc .

       

       

       

       

       

       

       

       

       

       

       

       

       

       

       

       

       

       

       

       

       

       

       

      4.Steel structure design common norms are as follows:


      "Cold-formed steel structure technical specifications" (GB50018-2002)
      "Construction Quality Acceptance of Steel" (GB50205-2001)
      "Technical Specification for welded steel structure" (JGJ81-2002, J218-2002)
      "Technical Specification for Steel Structures of Tall Buildings" (JGJ99-98)

       

       

       

      5.Guidance installation
      Shengbang Steel Structure Company can supply the guidance installation service.Usually steel structure building is a large installation engineering. If customers may need the professional technical engineer to supervise the installation on site overseas, the customer must to inform before 1 months from leave the China . But customer should coordinate with us for following aspects:
      Customer should provide:
      1) Translator or assistant on site.
      2.)All costs raised including:
      A. visa fee
      B. Round trip flight ticket
      C. Accident insurance for the supervisor during the period
      D. Accommodation
      E. Daily meals
      F. Internet
      G. Local traffic fee (if any)
      3) The customer should pay the engineer with supervision fee, which can be negotiated and decided by both.
      4)Customer has the responsibility to provide necessary security system to protect the supervisor, especially in some unrest countries.
      There have some guidance installation picture:

       

       

      Contact way

      1)FOSHAN SHENGBANG STEEL STRUCTURE CO., LTD
      2)Add:Pingtang Industrial Park, Shipeng Village, Shishan Town, Nanhai District,
      3)Foshan, Guangdong Province, China
      4)Tel:0086-757-63323396/0086-757-18900873268 Fax:0086-757-81196682

      Hits:8606 Time:[2020-8-30]

      Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
      久久综合久久自在自线精品自

          成全视频免费高清观看在线电视剧| 亚洲色图无码高免费| 国产欧美一区二区精品久久久| 久久人人爽人人双人av| 国产成网站18禁止久久影院| 伊人久久综合精品无码av专区| 永久939W79W99W乳液| 国产办公室沙发系列高清| 野外做受又硬又粗又大视频√| 日韩高清在线观看AV|