久久综合久久自在自线精品自,午夜肉伦伦影院无码,999视频精品全部免费品,伊人伊成久久人综合网小说

      Language:CHINESESENGLISH

      Home > News >
      CONTACT US
      • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
      • Phone:0757-81002668/0757-63323396
      • Fax:0757-81196682
      • Contact:Ben Zheng/13826981293 Kerry Lu/13751224830
      • E-mail:sbs@sbsprefabhouse.com
      • URL:http://www.iigii.cn
      Steel construction end
      Steel construction end "fast food room" The eighties and nineties, around the speed of urbanization, a large number of buildings constructed intensive. They stand in the face of residential buildings, some experts expressed concern that "the spot" u...
      2014/11/29
      Foundation work construction progress steel engineering controls
      Fixed (1) Fixed operating control for construction progress has construction and installation of fixed duration, work quotas and so on.(2) information gathering, statistical work which involves steel construction contractors and subcontractors to, ma...
      2014/11/26
      4 cars can be made of scrap steel structure villa
      July 2014, the State Council issued the three ministries notice asking since September 1, 2014 to December 31, 2017, for the purchase of new energy cars are exempt from vehicle purchase tax. Analysis of the industry, which is both one of the specific...
      2014/11/26
      Construction steel
      1, steel classificationHardness: partial volume inside the steel surface to resist foreign objects pressed into the ability to produce plastic deformation, is a measure of the degree of soft and hard steel.By Carbon Content: Low Carbon (C <0.25), ...
      2014/11/26
      How to build a more comprehensive light and heavy steel plant?
      How to build steel plant? We all know that when carrying out home improvements we will have a budget, according to how much a given grade decoration, decoration materials prices budgets, etc., we build steel plant at the time it was the , we need to ...
      2014/11/22
      Steel processing security measures to ensure the
      (1) steel processing security measures1) small and medium sized construction machinery should be set in accordance with the orientation of the processing plant construction plane making reasonable arrangements to meet the assembly line needs.2) The d...
      2014/11/22
      Rudbeckia giant ball coming out of Shanghai Chrysanthemum Show
      By Xinmin Evening News, Shanghai est Forest Park jointly organized the "Old Phoenix" 2014 Shanghai chrysanthemum exhibition exhibition has more than half, in addition to much more than 800 kinds of high quality Mingte picking daisy Chrysanthemum Tea ...
      2014/11/22
      Steel painting project quality inspection records
           Ⅰ basic requirements and content      (1) anti-corrosion coatings, painting several times, coating thickness shall meet the design requirements. When designing the coating thickness no requirements, the t...
      2014/11/19
      Steel shot rule haze "combined"
      Traditional architecture produces tons of garbage each year up to generate daily sewage up to 5.8 million cubic meters, the total social terminal building energy consumption ratio up to 27.5% ...... typical "two high-consumption" Construction extensi...
      2014/11/19
      258 meters all-steel housing will be built in the member when the Lake
      ■ building energy museum and the public to experience the versatility Trinity roller shutters. Foshan Steel The country's highest all-steel residential building where? Lake in Xiamen. Yesterday, at the international building energy efficiency and gr...
      2014/11/19
      Steel works construction schedule control content
      (1) pre-schedule control include: steel structure engineering controls to determine the construction schedule of work content and features, control methods and specific measures to achieve the objective analysis of the progress of risk presented prob...
      2014/11/15
      Elevated Rail Station largest domestic steel cable-membrane canopy project is completed
           At present, the elevated rail transit stations in the largest steel cable film project - Shanghai Rail Transit Line 11 # Longyang Road elevated station south section steel canopy project, recently China Railway Construction S...
      2014/11/15
      page:38  1  2  3  4  5  6  7  8  9  10  11  12  13  14  15  16  17  18  19  20  21  22  23  24  25  26  27  28  29  30  31  32  33  34  35  36  37  38  39  40  41  42  43  44  45  46  47  pervious next  

      Copyright:佛山市勝邦鋼結(jié)構(gòu)有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號(hào)
      久久综合久久自在自线精品自

          538K色带精品| 黄色视频在线免费观看| 精品国产三级A∨在线| 天堂草原电视剧在线观看| 日本入室强伦姧BD在线观看| 久久久久久精品毛片免费不卡| 三年片在线观看免费观看高清电影| 成年人免费国产视频| 熟妇人妻AV无码一区二区三区| 日韩毛片|